Resolutions Passed, September 2, 2025

Download Full Resolution Details

  • 25-0648 Recognizing the month of September as National Recovery Month
  • 25-0649 Authorizing the change order number 1 final to the contract for the medina County Pavement Planing and Repair project between Crossroads Asphalt Recycling, Inc. and the Medina County Board of Commissioners
  • 25-0650 Determining the necessity to close Greenwich Road for culvert replacement
  • 25-0651 Determining the necessity to close Lake Road for culvert replacement
  • 25-0652 Determining the necessity to close Smith Road, C.H. 4, for culvert replacement
  • 25-0653 Approving change order #1 to the contract for C.H. 2 Medina Line Road Bridge #18 Replacement Project OPWC Project No. DIAB11 between Cole Excavating LLC and the Medina County Board of Commissioners
  • 25-0654 Declaring the necessity to upgrade the existing electrical infrastructure at the Hinckley WWTP and authorizing the Sanitary Engineer to commence advertising for construction bids
  • 25-0655 Authorizing the Sanitary Engineer to enter into an agreement with Wade Trim, Inc. for water main construction inspection services for the Main Drive Water Main Project
  • 25-0656 Authorizing the Sanitary Engineer to enter into an agreement with Wade Trim, Inc. for water main construction inspection services for the C.H. 19 Lake Road Realignment, O.P.W.C. Project No. DIAC08
  • 25-0657 Authorizing the Sanitary Engineer to replace the existing HVAC system at the Liverpool Wastewater Treatment Plant through Equalis Group competitive bidding
  • 25-0658 Authorizing a memorandum of understanding with the Village of Chippewa Lake to replace existing sanitary sewer and water mains as part of the village’s Brookshore Drive Improvement Project
  • 25-0659 Accepting and awarding the bid for the Garman Road Well Development Project
  • 25-0660 Authorizing the Sanitary Engineer to request qualifications for professional design services to design and provide construction management services for the Chippewa Road Water Main Replacement Project
  • 25-0661 Authorizing the Sanitary Engineer to enter into an agreement with Dixon Engineering for professional design services to rehab Windfall Elevated Storage Tank
  • 25-0662 Amending the Prevention, Retention & Contingency Plan (PRC) for Medina County Job and Family Services
  • 25-0663 Authorizing a continued contract between Medina County Job and Family Services and the Dave Thomas Foundation for adoption
  • 25-0664 Approving personnel changes for the employees under the jurisdiction of the Medina County Commissioners
  • 25-0665 Expenditure adjustments for various funds
  • 25-0666 Revenue adjustments for various funds
  • 25-0667 Authorizing the purchase of 6,600 gallons of regular unleaded gasoline for the Engineering Center
  • 25-0668 Declaring Medina County property as excess property
  • 25-0669 Approving the transfer of Medina County Inventory between various Medina County offices
  • 25-0670 To allow expenses of the County Engineer
  • 25-0671 Allowing expenses of county officials
  • 25-0672 Allowing claims and authorizing issuance upon the treasurer in settlement of such list of claims
  • 25-0673 Repealing Resolution No. 19-0413 and adopting the All Hazard and Flood Mitigation Plan as submitted by the Medina County Emergency Management Agency
  • 25-0674 Accepting proposals for the Medina County Jail Inmate Communications System and awarding a contract
  • 25-0675 Authorizing a change order for the Hubbard Valley Radio Tower project
  • 25-0676 Approving the return of a vehicle from Medina County Emergency Management Agency to Perceptics
  • 25-0677 Approving the transfer of a vehicle from Medina County Emergency Management Agency to York Township
  • 25-0678 Approving a memorandum of understanding for the Medina County Mental Health & Recovery Board participation in the Senior and Adult Services programming
  • 25-0679 Authorizing the advertisement for bids for the Medina County Program Year 2024 Community Development Black Grant (PY24 CDBG) City of Wadsworth Sidewalk Replacement Project
  • 25-0680 Authorizing change order #1 for the Program Year 2024 (PY24) Community Development Black Grant (CDBG) funded City of Brunswick Street Improvement Project

Download Full Resolution Details

Back To Top